Air quality in times of pandemic
The EURO3 Building is an office building with more than 7 floors, housing a total of approximately 13,000 m2. Following the first wave of Covid-19 and the March 2020 lockdown, the EURO3 Building property decided to review the air quality inside the building to ensure the safety and health of the people who work there.
Joan Roca, Counselor and representative of the property, had the support of the WiseUp team to develop a work plan that aimed to achieve the maximum air renewal to dilute the possible existence of the virus in the building.
We were not starting from scratch, WiseUp already had a consumption monitoring system for the climate and comfort production room in the North Zone and the South Zone in the building. On the other hand, we had an original air conditioning project carried out by the company Ramon Vizcaino, S.A., which is why we started from a base for calculating the flow rates of air conditioners preserved from their design.
EURO3 building frontside.
Joan Roca, property representant and Jofre Ayala from WiseUp.
Given that the best recommendations are to provide the maximum flow of fresh air, it was calculated how much could be the maximum of external air supplied, and it was determined to increase the air supply from the outside by 60%. For this purpose, the supply sections were expanded to be able to keep the existing air conditioners working at speeds that did not generate noise.
In conclusion, a control is being carried out to comply with the 60% extra air supply objectives through the WiseUp platform and executing the corresponding actions to maintain the air quality of the building and, therefore, safety and health of the people inside, while optimizing energy consumption.
Dominican Republic
1.255
Hotel Colonial & Hotel Elegance
· HVAC Production
· Water distribution
· Air Handle Units in Restaurants a · · · Noble areas
· Lighting
· BMS Integration: Siemens, Robot y · · Schneider Electric
Dominican Republic
4.112
Seven Hotels
· Power transformation stations, 20 units
· Air Handle Units one Hotel
· Power and Lighting
· Room Control
· BMS integration:
Schneider Electric
· ERP Integration
Mexico
1.009
Three Hotels
· Resort Power
· Production and distribution of: Cold water, hoot wáter, Osmosis treated wáter
· BMS Integration: Robot & Schneider Electric
Catalonia / Spain
47
Healthy primary attention, schools and employments office
· Power Consumption
· Gas Consumption
· Water Consumption
· Legionella treatment control- Hot Water tanks
· BMS integration: Schneider Electric, Sauter, Siemens
Designed with Mobirise web page maker